Published, itemized turnkey renovation pricing — design from ฿2,000/sqm, construction from ฿20,000/sqm — with real worked examples for 60/90/150 sqm condos.
Read More →
Where can you buy a modular wardrobe system in Thailand? An honest guide to retailers, imported showrooms, carpenters and factory-built custom…

What to compare when choosing a modular wardrobe for a small Thai condo: depth, door clearance, board type, humidity, hardware, ventilation and…

Walkways, seat depth, seat height, L-shape or three-seat, and the lift and corridor measurements to take before you buy a sofa for a Bangkok condo.

Leather, linen, bouclé, velvet or performance fabric? How each sofa covering copes with Bangkok heat, humidity, sun and pets — and how to care for…

How long, how wide and how high a dining table should be, and how solid wood, veneer and stone tops behave in Bangkok humidity. A guide before you…

Commissioning a travertine or marble table in Bangkok: filled vs unfilled, honed vs polished, etching, sealing, weight, lift access and edge…

A practical guide for expats furnishing a Bangkok condo with custom furniture: lift limits, building rules, humidity, timing and your first…

How to furnish a Bangkok condo for rent: durable frames, performance fabrics, the storage tenants value, sizes that photograph well, and…

Renting furniture in Bangkok or buying custom? An honest comparison from a studio that does not rent: when each one wins, and how to do the maths.

Commissioning custom furniture in Bangkok for a Singapore home: lift and door sizes, sea freight, crating, import GST, timelines and remote design…

Importing custom furniture from Thailand to Australia: biosecurity rules for timber and packaging, GST and duty, cleanliness, upholstery and…

Published, itemized turnkey renovation pricing — with real worked examples for 60/90/150 sqm condos.

Isolating the design fee from construction cost — what's included, and worked examples for 60/90/150 sqm.
The luxury brands charge for the name. We charge for the piece.

The process is simpler than you think. Here is exactly how commissioning a custom sofa works.

Both are rigorous. But they approach quality differently — and one fits Bangkok better.

Materials, sizing, base design, and what to avoid — everything you need before commissioning.

Bangkok condos and villas have specific challenges. Here is how custom furniture solves them.

A sofa can cost ฿1.4 million. A breakdown of where that money actually goes.

There is a Korean designer making custom furniture in Bangkok — here is why the results look nothing like European imports.

An honest, specification-by-specification comparison — not a sales pitch.

An honest answer to a question we get weekly — what CHANINTR is genuinely best at, and when commissioning the piece is the better decision.

What CHANINTR actually sells, what custom actually costs, and how to tell which one your project needs.

The Minotti look comes down to a handful of repeatable decisions about line, depth and material — and what each costs to build here.

Every serious furniture showroom in Bangkok, what each one is actually good for, and the price band to expect before you walk in.

Duty, freight, showroom margin and lead time — what sits between an Italian factory price and a Bangkok price tag.

Cassina sells proportion more than material. What that means when a piece has to fit a Bangkok condo, not a Milan showroom.

Modular systems solve for the factory, not for your wall. Where the modular approach stops and millimetre joinery begins.

Loose furniture can be bought. Joinery has to be built to the room — why buyers commission their cabinetry elsewhere.

Poltrona Frau built its reputation on leather. What that means in construction terms, and what it costs to match in Bangkok.

What Ligne Roset does well, where it sits on price in Bangkok, and when a custom build answers the same brief better.

Korean design is not minimalism with things removed. What the aesthetic is doing, and why it suits a Bangkok condo.

The rooms that look effortless are rarely bought off a showroom floor. What separates a specified room from a furnished one.

Frame, spring, foam, fabric, finish — the eight stages a commissioned sofa passes through, and why each takes as long as it does.
© 2026 · Operated by Yunmin Co., Ltd. · Thai Co. Reg. (pending) · 3rd Floor, 272 Than Thip 3 Alley, Phlabphla, Wang Thonglang, Bangkok 10310
Contract, bulk and OEM furniture manufacturing is handled by our sister company Factory Source Thailand.